4/5 Bidding

The primary goals of this renovation project are to create a more spacious main bathroom and to upgrade bathroom fixtures for comfort. Should budget allow, upgrades these will also be applied to the home's second bathroom.

 

MEETING SCHEDULE

Initial Meeting, Establishing Project Scope - 07/07/18
Concept Board Meeting - 07/17/18
Initial Concept and Pricing - 07/22/18
Renovation Package - 08/13/18   Click to Download  Download Contractor PDF

CONTRACTORS

Ethan Thomas Ring
Contact: Ethan.t.ring@gmail.com
$6950 Labor, Client to Supply Materials
Download PDF

HandiAndi
Contact: Andy Bateman / handiandi0401@gmail.com
$5,000 Labor, Client to Supply Materials
Download PDF

G&B Carpentry
Contact: Marilyn / gandbcarpentry2@hotmail.com
$9,870 Labor, Client to Supply Materials
Download PDF


Concept Board

Color

  • Clean and bright

  • Tons of light

  • A soft hint of color (rose gold, soft pinks and blues, yellow, pea green)

  • Variegated colors

 

Pattern

  • Quiet pattern with a subtle sense of design

  • Linear tiles (square, subway)

  • A sense of order, neatness

  • Clean looking patterns

 

From the Look Book

  • The all-white look

  • A sense of cheerfulness

  • Clawfoot tub

  • Recessed shower shelf


Project Details

PROJECT Goals

  • Create a more spacious bathroom

  • Install a more comfortable toilet

  • Consider changing to a pedestal or floating sink to create a sense of spaciousness

  • Consider 1. Upgrading tub/shower or 2. Repair chip in existing tub/shower or 3. Changing to a shower only

  • UPDATE 07/17/18: Consider shower only option

  • UPDATE 07/17/18: Add in a shower bench

  • Consider new wall and floor tile

  • Add storage (Note: Open shelving is OK unless under sink, in which case closed cabinets are preferred)

  • Upgrade lighting

  • Upgrade exhaust fan

See Bathroom Checklist

 

scope of work - bathroom #1

Plumbing

  • Diagnose and repair leak at tub/shower wall

  • Install new fixtures (sink, toilet, tub/shower)

  • Optional: Repair chip in existing tub

Electrical

  • Add/Relocate power outlets

  • Install new lighting fixtures

  • Install new exhaust fan

Finishing

  • Install new tile

  • Patch and repair drywall

  • Paint

Miscellaneous

  • UPDATE 07/17/18: Install shower bench

 

scope of work - bathroom #2

Same as above for second bathroom as budget allows. Note, however, this bathroom doesn't show signs of leaking, so leak exploration/repair and associated drywall repair will not be needed.

 

Budget

$10,000

 

Schedule

Project Start - July 2018
Construction Completion - December 2018

 


Bathroom Photos

Images of the existing bathroom, pre-renovation.