4/5 Bidding
The primary goals of this renovation project are to create a more spacious main bathroom and to upgrade bathroom fixtures for comfort. Should budget allow, upgrades these will also be applied to the home's second bathroom.
MEETING SCHEDULE
Initial Meeting, Establishing Project Scope - 07/07/18
Concept Board Meeting - 07/17/18
Initial Concept and Pricing - 07/22/18
Renovation Package - 08/13/18 Click to Download Download Contractor PDF
CONTRACTORS
Ethan Thomas Ring
Contact: Ethan.t.ring@gmail.com
$6950 Labor, Client to Supply Materials
Download PDF
HandiAndi
Contact: Andy Bateman / handiandi0401@gmail.com
$5,000 Labor, Client to Supply Materials
Download PDF
G&B Carpentry
Contact: Marilyn / gandbcarpentry2@hotmail.com
$9,870 Labor, Client to Supply Materials
Download PDF
Concept Board
Color
Clean and bright
Tons of light
A soft hint of color (rose gold, soft pinks and blues, yellow, pea green)
Variegated colors
Pattern
Quiet pattern with a subtle sense of design
Linear tiles (square, subway)
A sense of order, neatness
Clean looking patterns
From the Look Book
The all-white look
A sense of cheerfulness
Clawfoot tub
Recessed shower shelf
Project Details
PROJECT Goals
Create a more spacious bathroom
Install a more comfortable toilet
Consider changing to a pedestal or floating sink to create a sense of spaciousness
Consider 1. Upgrading tub/shower or 2. Repair chip in existing tub/shower or 3. Changing to a shower only
UPDATE 07/17/18: Consider shower only option
UPDATE 07/17/18: Add in a shower bench
Consider new wall and floor tile
Add storage (Note: Open shelving is OK unless under sink, in which case closed cabinets are preferred)
Upgrade lighting
Upgrade exhaust fan
scope of work - bathroom #1
Plumbing
Diagnose and repair leak at tub/shower wall
Install new fixtures (sink, toilet, tub/shower)
Optional: Repair chip in existing tub
Electrical
Add/Relocate power outlets
Install new lighting fixtures
Install new exhaust fan
Finishing
Install new tile
Patch and repair drywall
Paint
Miscellaneous
UPDATE 07/17/18: Install shower bench
scope of work - bathroom #2
Same as above for second bathroom as budget allows. Note, however, this bathroom doesn't show signs of leaking, so leak exploration/repair and associated drywall repair will not be needed.
Budget
$10,000
Schedule
Project Start - July 2018
Construction Completion - December 2018
Bathroom Photos
Images of the existing bathroom, pre-renovation.